This is episode 4 of five short conversations with Walter Zhong, process lead on the SND project, where we have been building an intelligent control system for wastewater aeration. Episode 1 showed the system under stress. This one goes back to the beginning: why the project started, and why its goal changed once the plant was reliably on spec.

fig. 01 — Episode 04 · Walter Zhong, process lead, SND project. Original audio in Chinese, English captions.

What Walter Said

"Seven or eight years ago, many plants were exceeding total nitrogen limits. Exceeding limits is a serious environmental incident. So at first, the goal was simple: just meet the standard."

"Every team needs some kind of KPI. Energy saving was the natural choice. So I wanted to bring this technology out."

The interview was recorded in Chinese. The captions and quotes here are our translation.

Why Compliance Came First

Nitrogen that leaves a treatment plant does not disappear. In rivers, lakes and coastal waters it feeds algal growth, and that is why discharge limits on total nitrogen are enforced. As Walter puts it, exceeding them is not an inefficiency to be tuned later. It is an environmental incident.

Removing nitrogen biologically depends on getting conditions in the aeration tanks right: enough oxygen for the bacteria that convert ammonia, without disrupting the stages that need less. When load swings, as it does at this plant, holding that balance by hand is hard. So the first job of the control system was the plainest one: keep the effluent on spec.

Why Energy Is the Natural Next KPI

In activated-sludge plants, aeration is typically the largest single draw on electricity. Blowers run around the clock to keep dissolved oxygen where the biology needs it. Supply too much air and the plant pays for power that does nothing. Supply too little and nitrogen removal suffers.

Operators manage that trade-off sensibly: when you cannot watch the process every minute, you keep a margin of extra air as insurance. Once a control system can hold compliance dependably, responding every cycle instead of every shift, the obvious next question is how much of that margin is still needed. That is where energy saving comes from: not from taking risks with the effluent, but from no longer needing as much insurance.

The Order Matters

Compliance is the floor. Savings come on top. That sounds obvious, but it shapes how the system is built:

  • Effluent quality is a constraint, not one objective to be traded against another. Energy is only optimised inside the room compliance leaves.
  • Readings are screened before they reach a decision. A controller saving energy on bad data is spending a margin it cannot see.
  • When the system is unsure, it falls back to conservative behaviour rather than chasing savings.
  • Learning models start with no authority and earn a share of decisions only after sustained compliant operation on live data.

The lesson travels well beyond wastewater. Any AI system put in charge of an operational process needs its never-break constraint defined before the metric it is meant to improve. An optimiser without a floor will find its savings by quietly spending your safety margin.

Where It Stands

The project is still in progress. We are not publishing energy figures. A savings claim only means something once it has been measured over time against a fair baseline, with compliance held throughout, and this series sticks to what Walter describes on camera.

The Rest of the Series

  • Previously, episode 1, Better than a senior operator: how the control system held effluent steady while load swung from zero to 150%.
  • Coming up, Finding the lever: why a decade of digital twins and smart water platforms left the industry with good dashboards but little control.
  • Coming up, It came down to one pipe: the AI caught a fault straight away, but the fix on site still took days.
  • Coming up, Still a bit like a new hire: an honest look at what the system did when it met a situation it had never seen in training.
Follow the series on LinkedIn ↗
New episodes every few days

work with us

The engineering in this note is what we build for clients.