Industrial AI · NOV 10, 2026 · 5 MIN READ

Better Than a Senior Operator: Wastewater Aeration Control Under Shock Loads


This is the first of five short conversations with Walter Zhong, process lead on the SND project, where we have been building an intelligent control system for wastewater aeration. Episode 1 is about the moment that tests any controller: what happens when the load stops behaving.

fig. 01 — Episode 01 · Walter Zhong, process lead, SND project. Original audio in Chinese, English captions.

What Walter Said

"In controlling total nitrogen and keeping effluent on spec, it works like a senior operator, even better than one. It has been remarkably stable. When the pump kicks in, the load hits 100%, even 150%. When it stops, the load drops to zero. With shock loads swinging that hard, it has held up remarkably well."

The interview was recorded in Chinese. The captions and quotes here are our translation.

Why Shock Loads Are the Real Test

At many plants, wastewater does not arrive in a steady stream. It arrives in pulses. A lift pump starts and the biological tanks suddenly receive a full load, sometimes more than full. The pump stops and the load falls away. The microorganisms that remove nitrogen need oxygen in proportion to what they are being fed, so the air supply has to follow the load up and down.

By hand, that is hard. Operators set blowers and valves from experience and from lab results that arrive hours after the water they describe has moved on. On a steady day, a seasoned operator can hold the line. When load swings from zero to 150% and back, any fixed setting is wrong most of the time. Too little air on the peak and nitrogen removal suffers. Too much in the trough and the plant pays for electricity that does nothing.

"Better than a senior operator" is not a claim that software knows more than the people who run the plant. It means responding every cycle, without fatigue, to changes no shift can watch continuously.

What Is Actually Doing the Controlling

"AI control" covers a lot of ground, so it is worth being precise. The system is built in layers:

  • An expert engine that encodes how experienced operators run the process, coordinating valves, blowers and dosing in a layered strategy that always tries the gentlest lever first.
  • A data-quality layer that screens out calibration windows, frozen readings and spikes before any reading reaches a decision.
  • Plant profiles that describe each site's instruments, valves and blowers, so one software build can serve different plant layouts.
  • Machine-learning models, trained on the plant's own history, that start with no authority at all and only earn a share of decisions after sustained compliant operation on live data.

The stability Walter describes comes from operator expertise, encoded and applied faithfully every cycle, on data that has been checked first. The learning models work alongside it as apprentices, not replacements.

Why a Senior Operator Is the Benchmark

Comparing a controller with a person can sound like marketing. For us it is the design brief. A senior operator is the person a plant trusts to keep it compliant on a bad day. If a control system cannot match that judgement under stress, it has no business running the plant. If it can, the operator is free to deal with what software cannot: maintenance, equipment faults and the genuinely unexpected. As later episodes show, those still happen.

It is also why compliance is the floor, not a trade-off. Energy and chemical savings matter, but they only count if the effluent stays on spec while they are made.

Where It Stands

The project is still in progress. The control core is running and the learning pipeline is built. The models will only begin sharing decisions once they have proved themselves on enough live data from the plant. We are not publishing figures beyond what Walter describes on camera. This series is about how the system behaves, in the words of the person responsible for the process.

Coming Up in the Series

  • From compliance to savings: how the project started, and why energy became the next KPI once the plant was reliably meeting its limits.
  • Finding the lever: why a decade of digital twins and smart water platforms left the industry with good dashboards but little control.
  • It came down to one pipe: the AI caught a fault straight away, but the fix on site still took days.
  • Still a bit like a new hire: an honest look at what the system did when it met a situation it had never seen in training.
Follow the series on LinkedIn ↗